The Revised Final EIR for the Marriott Residence Inn and Hollister Center Project (12-EIR-1; SCH #2007121058) is comprised of two parts:

Part 1 consists of the October 2013 proposed Final EIR located here

Part 2 includes the documents below which include:

     -Comment letters and responses to the comments received during the additional public review period (December 3, 2013 – February 3, 2014);

     -Changes to the Revised Draft EIR (February 2013) and proposed Final EIR (October 2013) which were triggered by these newest comments;

     -An updated AllianceJB traffic report to clarify inconsistencies in the October 2011 report; and

     -An updated Penfield and Smith Engineers drainage memo confirming that the project grading and drainage plan complies with the most recent Regional Water Quality Control Board stormwater directives.

The Planning Commission will consider the RFEIR and related actions on Monday, July 28th at 6:00pm.  Further details are located in this Notice:

  • Notice of Availability/Intent to Certify Proposed Revised Final EIR... and Notice of Public Hearing Planning Commission
  •  

    REVISED FINAL EIR:

     

    APPENDICES:

    Free viewers are required for some of the attached documents.
    They can be downloaded by clicking on the icons below.

    Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer