Venoco Platform Holly Cable Replacement Project

Print
Press Enter to show all options, press Tab go to next option

In 2013, Venoco replaced the power cable between the EOF and Platform Holly. The City issued a Development Plan (12-045-DP), Conditional Use Permit (12-045-CUP) and Land Use Permit (13-027-LUP) for the portion of the project which occurred within the City’s boundary.  The Coastal Commission also issued a Coastal Development Permit (CDP No. E-13-001).

The portion which occurred within the City’s boundary was approximately 800 feet of replacement cable which is the initial portion of a 15,700 foot long power cable from the Ellwood Onshore Facility to Platform Holly.

More information on the project can be found within the Mitigated Negative Declaration below.

Venoco Platform Holly Cable Replacement Project MND