Ekwill-Fowler Road Extensions

The project consists of construction of two new roadways and operational improvements, that include the extensions of Fowler Road from the existing South Street stub to existing Fairview Avenue, Ekwill Street from the existing Kellogg Avenue intersection with Kellogg Way westward to connect to Fairview Avenue, roundabouts at the intersections of Fowler Road and Fairview Avenue, Ekwill Street and Pine Avenue, and at the intersections of Hollister Avenue with State Route 217 on and off ramps, and the extension of the existing northbound right turn lane for Kellogg Avenue onto Hollister Avenue. The two new roadway extensions would contain one lane in each direction, left turn pockets, bike lanes and sidewalks on both sides of the street and extensive landscaping. The project also includes construction of a portion of the Old San Jose Creek trail along Ekwill Street.

Planning Commission Hearing: November 28, 2011

Schwan Self Storage Project

This project is located at 10 South Kellogg. The project would include demolition of all existing development on site and construction of three separate, 3-story mini-storage buildings inclusive of an office/sales space and manager's unit on a 2.23-acre site.  Total new square footage on site would be 110,600.

Planning Commission Hearing: October 24, 2011

South Fairview Commercial Center Project

The proposed project is located at 151 South Fairview Avenue. The project would include construction of a 16,216 square-foot, two-story mixed use structure (commercial, office, residential) on 0.80 acres. 

Planning Commission Hearing: April 11, 2011

South Kellogg Recycling Facility Project

The project is located at 903 South Kellogg Avenue. The project would include construction of a 960 square-foot office building and 1,840 square-foot equipment garage on a 4.935 acre parcel.

Planning Commission Hearing: October 24, 2011

Village at Los Carneros Project

This project includes 465 unit residential project on 43+ acres located to the north of the Allergan buildings in the Campus Pointe Business Park between Los Carneros Road, Tecolotito Creek, and the Southern Pacific Railroad tracks in the City of Goleta. The project includes a request for a General Plan Amendment to remove the current AHO (Affordable Housing Opportunity) Overlay on APNs 073-330-026, 028, and 029, a rezone of the entirety of the project site to PRD 465, and a request for approval of an ordinance amendment for a new Development Agreement between the City of Goleta and CHA McKinley Goleta LLC.


Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer