Playground Improvements

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Click here to have Recreation Updates delivered to you via email or text.

Construction began in early October 2021! The Current Phase section below contains specific dates about each park.

Description

The City has plans to upgrade the playground equipment at six neighborhood parks in two phases: Berkeley, Andamar, Winchester I & II, followed by San Miguel and Santa Barbara Shores.

Current Phase

We are pleased to announce that the projects at Berkley Park have been completed and the park has been open to the public. Winchester Parks I & II are both in the final stages of their respective projects, with the completion date in sight. Winchester I Park completion date is approximately three to four weeks, with the park incorporating new fitness equipment and fencing. Irrigation and landscaping improvements are also expected to be implemented soon. Winchester II Park is also nearing its completion date with a timeframe of approximately two more weeks until completion. This park boasts improvements in the form of a new playground, fencing, irrigation and walkway. Andamar Park is in the process of incorporating some big changes as well in the form of a new expanded playground and walkways. The estimated completion date is approximately four weeks away. For questions, please contact JoAnne Plummer, Project Manager, at (805) 562-5505. Ribbon cutting dates coming very soon! 

Previous Phase

In early October 2021 construction began at Berkeley Park and has been completed with both playgrounds being open to the public. Work began at Winchester I Park and Winchester II Park in late October 2021 and we broke ground at Andamar Park in early December 2021. Winchester II Park is awaiting the installation of the surfacing materials and fencing at Calle Real. Winchester I Park will be installing fitness equipment soon, with the surfacing materials installed to complete this park site. Andamar Park is ready for the installation of the playground equipment, but residents will also notice work being completed for the ADA access to the park.

We are excited to announce construction will begin on Monday, October 4th beginning at Berkeley Park, on Tuesday, October 5th at Winchester I Park, and Wednesday, October 6th at Winchester II Park. During construction, portions of the park(s) or in some cases the entire park(s) will be closed to public access. Berkeley Park and Winchester I Park are expected to be completed before the end of October, Winchester II Park is expected to be completed before the end of November. Construction for Andamar Park is tentatively planned to begin the last week of October and to be completed by the end of the calendar year. Please keep in mind this schedule is tentative and could be modified based on field and/or weather conditions.  

The project was out for competitive bid from March 1st-29th, 2021. Award of contract took place in June to R.E. Schultz Construction with project kick-off in July 2021. Construction for all four parks is anticipated to take place from October-December 2021. 

The designs provided by the playground vendor were adjusted to accommodate the space in each of the parks.  The proposed designs are provided below.  On Tuesday, December 4, 2018 the City Council was asked to consider a purchasing agreement for the equipment only, not installation or surfacing.  Ordering the equipment for all four locations in 2018, and bidding the construction, installation and surfacing later is the most cost-effective approach for this project.  This will allow staff to maximize resources on the equipment and complete all four playground renovations, to be enjoyed by Goleta residents this year. 

Purpose and Need

In 2015, the City of Goleta completed a Recreation Needs Assessment (RNA) which was a comprehensive report that addressed both current recreation resources and offerings, as well as, projected community needs.  This assessment provided a roadmap to guide future recreation planning efforts.  This report also provided the City with an inventory and gap analysis on parks and facilities.

In December 2016, an overview of improvements in five of the parks that were identified in the Recreation Needs Assessment (RNA) was provided to the Parks and Recreation Commission.  In February 2017, an update was presented to the Commission identifying a sixth playground.

However, after further evaluation, two of the six sites require more extensive engineering and evaluation work--San Miguel Park and Santa Barbara Shores Park. Evaluations will continue at these two sites and the remaining four sites will move forward.

All the identified parks will not only receive new equipment, but will also have an accessible path leading from the sidewalk to the playground, and new playground safety surfacing. Council approved a unitary surfacing material to be used for all new and renovated playgrounds at the April 3, 2018, City Council meeting. View the full staff report and presentation here.

Equipment and Vendor Selection

In this first round of park improvements, four neighborhoods parks will be addressed – Berkeley, Andamar, Winchester I & ll. In order to gage what residents would like to see in their local parks, the City conducted two neighborhood outreach events in May 2017, to gather input from residents. In August 2017, the City also released a survey in English and Spanish to gather resident feedback. The Park Improvement survey and results are available here.

Based on resident feedback, an RFP went out to playground vendors. Six vendors submitted two designs for each of the four parks. The six vendors were narrowed down to three and interviewed at City Hall on October 10, 2018, by the selection committee. The selection committee were impressed with all three vendors that presented, but had an overwhelming desire to work with one vendor on these projects. After checking references, the selected Vendor is Sun Country Systems as the local representative for Play & Park Structures. 

Andamar Park

The existing equipment including the swings and slide will be replaced with swings, play structure that includes climbing, monkey bars and sliding for both toddlers and school age children as well as a merry-go-round, benches and shade. The area will be expanded to accommodate the additional equipment from 64’ x 40’ to 83.5’ x 62’.

Andamar Park rendering Andamar Park Rendering Attachment 2

Berkeley Park

Initially it was determined that the existing toddler equipment would not be removed, but rather, improvements were focused on replacing the swings with a climbing apparatus at a minimum.  After further evaluation, staff confirmed that the lifespan of the new surfacing will exceed the lifespan of the current toddler equipment.  As such, by changing out the existing equipment now, new equipment and surfacing would be installed that would provide the highest amount of longevity and use to park visitors.  The toddler area will have one dual bouncer and a climbing feature.  The other space will have a climbing apparatus designed for children 5 – 12 years old and this space will be expanded from 35’ x 30’ to 35’ x 36’.

Berkley Park rendering toddler areaBerkeley Park rendering children 5 - 12 years area

Winchester I Park

The current play area needed to be relocated closer to the street to allow for disabled access while maintaining a relatively large green space.  While 51% of the survey respondents requested structures for both age groups, the existing space does not allow for it.  The options for this space are limited due to the grade of the area.  The current swings will be removed as they do not comply with current safety standards. Instead of play equipment at this location, fitness equipment has been chosen to accommodate the space restrictions and to offer this recreational opportunity to residents in this area of Goleta.

Four different features will be installed along the north east side of the park to allow for maximum green space and to allow for ADA accessibility without excessive grading and/or the installation of a retaining wall.

Winchester 1 Park rendering

Winchester II Park

This park had the largest percentage of respondents to the survey of 83% of those that live immediately in the neighborhood.  This location will utilize the current play area with expansion to include climbers and swings for both age groups.  While there are many trees in this park, the improvements will include seating and shade for users and spectators. The expansion will still allow for t-ball baseball activities and soccer fields for children ages eight and under, not requiring additional adjustments to the remaining park space.  The expansion at this site will increase the play opportunity from 38’ x 31‘ to approximately 38’ x 110’. 

Winchester 2 Park renderingWinchester 2 Park Rendering Attachment 2

Project Manager:
JoAnne Plummer, Parks & Recreation Manager
JPlummer@CityofGoleta.org
(805) 562-5505